Ashtech MobileMapper 10 Specifikace Strana 31

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 64
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 30
English
25
•On the Offset tab, you can set:
The bearing and horizontal distance if you wish to
offset a point feature.
The direction (left or right) and horizontal distance if
you wish to offset a line or polygon feature.
MobileMapper Field also allows the logging of two features to
be run concurrently (“double logging”). This can be done
through the appropriate use of the Pause/Resume/Stop
functions. Double logging is useful to reduce both the time
spent logging features and the distance walked in the field.
MobileMapper Field allows you to delete a logged feature
directly from the map screen showing the location of this
feature.
Prerequisites
The receiver is on and MobileMapper Field running.
A Map job is used, which contains three SHP layers: a
point layer named “Points”, a line layer named “Lines”
and a polygon layer named “Areas”. All layers are set to
be seen on the map screen.
The units used have been set to meet your requirements.
The reception status is good (number of satellites>6,
PDOP<3). Especially for MobileMapper 6 and
MobileMapper 10, optimum position accuracy is achieved
in real time after waiting about five minutes of good
reception status. Then you can start collecting your first
feature.
Right
Bearing
Left
d= Horizontal Distance
d
d
d
N
1. Log
2. Pause
5. Resume
3. Log
4. Stop
6. Stop
Zobrazit stránku 30
1 2 ... 26 27 28 29 30 31 32 33 34 35 36 ... 63 64

Komentáře k této Příručce

Žádné komentáře